Limited Time Offer. Become a Founder Member Now!

Committee selects new pavilion lighting design; cost and installation details pending

October 03, 2025 | Atherton Town, San Mateo County, California


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Committee selects new pavilion lighting design; cost and installation details pending
A pavilion lighting design favored by the committee’s subcommittee — described as a bronze/bronze-colored modular fixture about 36–40 inches in circumference — was presented for consideration. Members cited ease of maintenance, modular replacement and a stronger downward illumination compared with other fixtures as reasons for the selection.

The committee said Coast Lighting will provide a cost breakdown and availability; members noted the fixture’s modular components are manufactured in Texas and are rated for about 50,000 hours. Committee members asked the vendor to demonstrate the fixture’s illumination in the pavilion showroom and requested that a single-vendor risk be assessed because modulars may require proprietary replacement parts.

Staff said the lighting purchase and any installation will be coordinated with interior recessed-lighting updates and that final pricing and installation scheduling will be brought back at a future meeting.

View full meeting

This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.

View full meeting

Sponsors

Proudly supported by sponsors who keep California articles free in 2025

Scribe from Workplace AI
Scribe from Workplace AI
Family Portal
Family Portal