Project team revamps entry plaza with bike racks and landscaping enhancements

June 14, 2025 | Ithaca City, Tompkins County, New York


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Project team revamps entry plaza with bike racks and landscaping enhancements
In a recent meeting of the Project Review Committee in Ithaca, New York, city planners discussed significant updates to the design of the entry plaza and surrounding areas of a new development project. The aim is to enhance the functionality and aesthetics of the space, responding to feedback from previous meetings.

One of the primary changes involves relocating bike racks to the south side of the plaza. This adjustment is intended to improve pedestrian flow by keeping the racks out of the main travel path. Additionally, planners proposed adding a planter and a bench directly across from the building exit. This new seating area will provide a comfortable spot for individuals waiting for rides or simply enjoying the space.

The committee also addressed concerns regarding the east corner of the building, where a large swale around a transformer posed challenges. To mitigate this, the transformer has been repositioned closer to the upper grade, allowing for better integration with the site’s geometry. Plans include constructing retaining walls that will support plantings to screen the transformer from view, enhancing the overall visual appeal of the area.

Further improvements include the addition of picnic tables and benches in a small landscaped area, creating a public space for relaxation. The landscaping plan will also feature columnar evergreen plants around the Oak Avenue porches, contributing to a more inviting outdoor environment.

In terms of logistics, the committee discussed the staging plan for construction, ensuring that fire lanes are maintained and that any necessary sidewalk or road closures are managed effectively. The project will utilize helical piles for foundation support, as preliminary soil tests indicate sandy conditions that require this specialized approach.

These developments reflect the city’s commitment to creating functional and attractive public spaces while addressing community needs. The next steps will involve incorporating these changes into the planning submission and continuing collaboration with city engineering on construction logistics.

View full meeting

This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.

View full meeting

Comments

    Sponsors

    Proudly supported by sponsors who keep New York articles free in 2025

    Scribe from Workplace AI
    Scribe from Workplace AI